• wewbull@feddit.uk
    link
    fedilink
    English
    arrow-up
    2
    ·
    24 hours ago

    Personally think this is a no-brainer. The cost of installation drops to almost zero if done during construction. It’s just a material cost (panels / cabelling / inverter)