cross-posted from: https://lemmy.world/post/39806045

Help scheduled for wednesday to lift in the kamado. I left the front beam and breads out for now so we don’t have to lift it that high.

The far right has no table top, there i’m gonna place a concrete slab with a castiron grid. Under it will be space for brikettes and my dutch oven(s)/skillets can be placed on the cast iron grid

  • redlemace@lemmy.worldOP
    link
    fedilink
    arrow-up
    4
    ·
    3 months ago

    Mostly screws sunken into the legs. The holes are plugged (if you zoom in you might be able to see I need to cut and sand some)

      • redlemace@lemmy.worldOP
        link
        fedilink
        arrow-up
        2
        ·
        edit-2
        3 months ago

        Thnx. Peg’s … Traditional. Needs different joints. Challenging, Can see myself building with pegs somewhere down the line.

        • DominusOfMegadeus@sh.itjust.works
          link
          fedilink
          arrow-up
          3
          ·
          3 months ago

          It’s such an elegant way of doing it. SO time consuming though. And I’m sure I would screw it up at least the first 15 tries before I got anything resembling ‘acceptable’.